§ 82-389. Elevation techniques for gravity flow.  


Latest version.
  • Unless otherwise authorized in writing by the city council, the building sewer shall be brought to the building at an elevation below the basement floor. In all buildings in which a building drain is too low to permit gravity flow to the public sanitary sewer, sewage carried by this drain shall be lifted by an approved sewage ejector to a height to permit gravity flow. All sewage ejector installations shall be approved by the city council.

(Code 1979, § 21-104.4)