§ 70-19. Warranty.  


Latest version.
  • All infrastructure installed by the developer which will be turned over to the city (streets, storm, water and sewer lines) shall have a one-year warranty by the developer from the date of acceptance by the city. In case the developer cannot repair said infrastructure in a timely manner, the city shall have the right to repair the infrastructure and bill the developer.

(Code 1979, § 45-1-4)