§ 70-10. Additional right-of-way on proposed streets.  


Latest version.
  • The right-of-way widths in areas of cut or fill must be increased two feet for each one foot of material removed for the cut or added for the fill. This additional right-of-way must be added to the side where the cut or fill takes place. The minimum allowable degree of slope on a back slope shall be 1.5 to one and on a fill slope, the degree of slope shall be two to one.

(Code 1979, § 45-1-2.8)