Before issuing a permit, the building official may examine or cause to be examined
any building, electrical, gas, mechanical or plumbing systems, for which an application
has been received for a permit to enlarge, alter, repair, move, demolish, install,
or change the occupancy. The building official shall inspect all buildings, structures,
electrical, gas, mechanical and plumbing systems, from time to time, during and upon
completion of the work for which a permit was issued. The building official shall
make a record of every such examination and inspection and of all violations of the
technical codes.
(Code 1979, § 42-3.8.1)
var val = document.getElementById('citecontent').innerHTML;
art.dialog.defaults.title = window.location.href;
art.dialog.data('cite', val);
art.dialog.data('homeDemoPath', '/Scripts/plus/artDialog/');
art.dialog.open('/Scripts/plus/artDialog/citeiframe.html');